Preventive Maintenance Schedule (Calendar + Gantt)

Plan all preventive maintenance for the year using an easy-to-read calendar and a resource-focused Gantt timeline. Assign roles, set durations, avoid conflicts and export scheduled lines to your CMMS.

3 Quick Benefits

  • Plan 12 months of PMs: visualise seasonal peaks and avoid clashes across lines.
  • Balance technician workload: Gantt + estimated hours help level-load shifts.
  • CMMS-ready scheduling: export scheduled PM tasks with frequency, duration and assigned role for bulk import.


What the templates give you

  • Master schedule (Excel + GSheet): master table of tasks, next-run date, frequency, duration and assigned role.
  • Calendar view: month-by-month visibility for communications and printing.
  • Gantt timeline: resource sequencing and overlap detection with weekly/monthly Zoom.
  • CMMS export CSV: rows with asset_id, task_name, next_run_date, frequency, estimated_hours, assigned_role ready for import.
  • Notes & dependency fields: shutdown-only flags and task dependencies for planning.


Who does this help 

  • Maintenance Planners: realistic routes, conflict avoidance and resource justification.
  • CMMS Admins: bulk-import schedules to reduce manual entry.
  • Reliability Engineers & Operations: plan seasonal work and coordinate shutdowns.
  • Shift Leads / Supervisors: visibility into upcoming work and hours required.

Frequently Asked Questions

What is a PM schedule, and why use calendar + Gantt?
A PM schedule lists recurring maintenance tasks with dates, durations and assigned staff. The calendar gives month-level visibility for stakeholders; the Gantt shows sequencing and technician load so you can avoid overlaps and level resources.
How do I create a realistic PM schedule?
List assets with criticality, attach PM task names and set frequency. Estimate realistic durations (use historical WOs if available), assign the correct trade, set first-run dates and let recurrence populate future runs. Resolve conflicts in the calendar and refine after a short pilot.
How do I map scheduled PMs to my CMMS?
Export scheduled rows as CSV with asset_id, task_name, next_run_date, frequency, estimated_hours, and assigned_role. Run a small test import (10–25 rows), verify recurrence and checklist alignment, then bulk import.
How should I set durations and handle shutdown-only tasks?
Base durations on measured task times (mean of past WOs), not guesses. For tasks that must occur during shutdowns, use the dependency or shutdown_only=true flag and schedule them inside planned outage windows to avoid disrupting production.

Guide

Download the Guide

Fill out the form to access your template

Thank you! Your submission has been received! Please find below the download link for the template.
Oops! Something went wrong while submitting the form.