What is Scheduled Maintenance?

Scheduled maintenance (also called planned maintenance) is a proactive maintenance approach where inspections, servicing, and parts replacement are performed at predetermined intervals, by time, usage, or condition, to reduce breakdowns and extend asset life. Instead of waiting for failure, organisations schedule maintenance to keep equipment reliable and predictable.
Why this matters: Well-planned scheduled maintenance reduces unplanned downtime, lowers emergency repair costs, improves safety, and helps you forecast spares and labour.
Benefits of a scheduled maintenance program
- Less unplanned downtime — fewer emergency outages and production interruptions.
- Lower total maintenance cost — reduced overtime, fewer expedited parts.
- Longer asset life — consistent servicing prevents premature wear.
- Predictable budgets & scheduling — plan technicians and parts in advance.
- Better compliance & audit trails — documented maintenance history.
Types of scheduled (planned) maintenance
- Time-based maintenance — service every X hours, days, weeks, months (e.g., monthly filter change).
- Usage-based maintenance — based on operating hours, cycles, kilometres (common in vehicles / rotating equipment).
- Condition-based maintenance — triggered by sensors/inspections (vibration, oil analysis).
- Calendar-based & seasonal — e.g., winterise HVAC systems annually.
How to build a maintenance schedule (step-by-step)
- Inventory assets — create an asset list with make, model, serial, and location.
- Classify criticality — rank assets by impact on safety, production, and cost.
- Define tasks & frequencies — create maintenance activities examples (inspection, lubrication, safety checks).
- Choose triggers — time, run-hours, sensor thresholds.
- Create work instructions & checklists — clear steps for technicians.
- Allocate parts & labour — identify spare parts and estimated times.
- Implement scheduling tool — spreadsheet, CMMS, or scheduled maintenance software.
- Monitor & improve — track KPIs (MTTR, MTBF, percentage planned work) and adjust frequencies.
Maintenance schedule examples & samples
Here are practical schedule examples you can adapt.
Weekly maintenance (example)
- Visual inspection of belts/hoses — 15 min
- Lubricate bearings on 3 machines — 45 min
- Check HVAC filters — 15 min.
Monthly maintenance (example)
- Clean heat exchangers — 2 hrs
- Check coolant & oil levels — 30 mi.n
- Test backup generator under load — 1 hr
Quarterly / Annual (example)
- Comprehensive safety audit — 4 hrs
- Replace major filters — 2 hrs.
- Full calibration of instruments — vendor dependent
Vehicle (scheduled maintenance on a car) sample
- Every 5,000–10,000 km: oil + filter, tyre rotation.
- Every 20,000 km: air filter replacement, brake inspection.
- Every 100,000 km: timing belt (model dependent).
(Always follow the manufacturer’s schedule.)
You can convert these into a maintenance schedule sample spreadsheet with columns: Asset, Task, Frequency, Last Performed, Next Due, Technician, Parts Needed, Notes.
Scheduling maintenance in practice (tips)
- Batch similar tasks to reduce setup time.
- Use maintenance timers or utilisation counters for accuracy.
- Communicate scheduled service windows to production/clients to avoid conflicts.
- Keep “maintenance scheduled” messages clear: show expected impact, start/end times, and contact. Example message template below.
Scheduled maintenance message (example)
“Scheduled maintenance in progress. Services will be unavailable from 10:00–11:00 UTC for routine updates. We expect no data loss. Contact [email protected] for urgent issues.”
Tools: scheduled maintenance software & programs
A scheduled maintenance program can be managed with:
- Spreadsheets — okay for very small fleets but error-prone.
- CMMS (Computerised Maintenance Management System) — track work orders, asset history, parts, and scheduling. Keywords: scheduled maintenance software, preventive maintenance.
- IoT & condition monitoring platforms — for condition-based triggers.
When evaluating software, look for: recurring task automation, calendar view, mobile execution, inventory/spare-parts management, and reporting (planned vs unplanned work).
Common mistakes to avoid
- Blindly copying vendor intervals without field verification.
- Over-scheduling (wasting labour) or under-scheduling (risking failures).
- Not tracking maintenance history — you’ll lose learning opportunities.
- Ignoring parts lead times — create reorder points.

.webp)