Preventive Maintenance Starter Kit Template

Get a practical PM starter kit built for Maintenance Supervisors and Operations Managers: Google Sheets route planner, PM checklists, daily logs and CMMS-ready CSV export samples. Pilot routes, schedule PMs, capture daily logs and import checklist tasks into your CMMS fast.

3 Quick Benefits


  • Fast PM adoption: route planner + checklist bundle gets crews executing PMs in days, not weeks.
  • Better route efficiency: group assets into routes to minimise travel and balance technician load.
  • CMMS-ready exports: CSV samples make it quick to import checklist items and recurring tasks.


What the templates give you

  • Route Planner (Google Sheet): group assets, estimate time per check, auto-calc route totals, and assign technicians.
  • PM Checklist Bundle: daily/weekly/monthly/quarterly checklist templates, each row single-action + acceptance criteria.
  • Daily Maintenance Log: capture findings, photos and immediate follow-ups for handover and CMMS work orders.
  • CMMS Checklist CSV samples: single-line rows (asset_id, task_name, frequency, estimated_time_mins) ready for import.
  • Implementation Guide & KPI dashboard: 14-day pilot plan, route-sizing tips and simple KPI tracking.


Who does this help 

  • Maintenance Supervisors: implement repeatable PM routes and measure time.
  • Operations Managers: reduce reactive work and show uptime improvements.
  • Reliability Engineers (secondary): standardise inspections for analysis.

Frequently Asked Questions

What is the PM Starter Kit, and why should I use it?
The kit bundles a route planner, PM checklists, daily logs and CMMS-ready CSVs so you can pilot a PM program quickly. It reduces setup time (no template-building) and shows fast operational wins (improved PM completion, fewer emergencies).
How do I run a 14-day pilot that proves value?
Pick 10–20 critical assets, group them into 2–4 routes in the route planner, assign technicians, run daily checklists, capture findings in the daily log, and import any routine checklist items to your CMMS. After 14 days of review, PM completion, route time and defects found, to decide next steps.
Can I import the starter kit checklists into my CMMS?
Yes, the pack includes CSV samples with common headers (asset_id, task_name, frequency, estimated_time_mins, acceptance_criteria). Run a small test import (10–25 rows), confirm recurrence and verifications, then bulk-import with minimal mapping.
How many checklists/assets should I start with, and what outcomes can I expect?
Start small: 10–20 assets and 1–2 routes. Typical early outcomes are measurable PM completion improvements within 2 weeks and reduced reactive work within 30–90 days. Use the included KPI dashboard to quantify improvements for stakeholders.

Guide

Download the Guide

Fill out the form to access your template

Thank you! Your submission has been received! Please find below the download link for the template.
Oops! Something went wrong while submitting the form.